Method of making reinforced concrete constructions such as subways, road tunnels and the like; prefabricated concrete elements for making such constructions
Abstract
1. Method of constructing reinforced concrete works such as road tunnels, underground galleries, tunnels for underground railways, according to which an open trench is first excavated, in which there are then placed, consecutively and contiguously, prefabricated hollow concrete elements (4) each consisting of a frame, and a filling is finally executed, characterised in that there is used for each prefabricated element a frame, the external faces of which comprise reinforcements (5), that a filler concrete (18) is poured covering the joints between elements and cooperating with the reinforced concrete of the elements (4) and with the reinforcements (5) so as to construct by consecutive stages, and rapidly, a monolithic work, the strength of which is appreciably greater than the respective strengths of the prefabricated elements (4) initially placed and of the filler concrete (18).
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 4.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.