Power supply with load-transient anticipation
Abstract
The varying loads (1) to which a power supply is subjected are anticipated before being placed across the power supply output by deriving device selection, direction of load change, and timing data from the control data transmitted to the load. The "on" and "off" times of the power transformer primary switch (12) in a switching regulator power supply are adjusted for optimum power supply response to the changed load. The calculations and ajustment are made before any load change has occured and the proper control signal (5, 6) to the switching regulator power supply are applied prior to or simultaneous with the load change.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 12.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (12 of 12 total)
References Cited — Backward Prior Art (3)
Non-Patent Literature (2)
- IBM TECHNICAL DISCLOSURE BULLETIN, vol. 23, no. 10, March 1981, New York C.L. ASHLEY et al. "Digital voltage regulator for switching power supplies", pages 4413-4414
- Patent Abstracts of Japan vol. 3, no. 67, 9 June 1979 Page 55E116 & JP-A-54-45769