Underground excavation construction process and equipment for rail transit air duct
Abstract
The application provides a subsurface excavation construction process and equipment for a rail transit air duct, wherein a supporting door frame is erected on the side wall of a multilayer pilot tunnel to strengthen the strength of the air duct, an upper grouting pipe is arranged at the top of the construction surface of an upper-layer pilot tunnel in the multilayer pilot tunnel, and grout is injected into the upper grouting pipe; and then, excavating on the construction surface of the upper-layer pilot tunnel, and excavating the lower-layer pilot tunnel below the upper-layer pilot tunnel when the construction length of the upper-layer pilot tunnel is greater than the preset length. The excavation operation of the lower pilot tunnel is started after the construction length of the upper pilot tunnel is greater than the preset length, so that the staggered construction of the upper pilot tunnel and the lower pilot tunnel is ensured, and the risk of ground surface subsidence is further reduced.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 0.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (6)
Non-Patent Literature (2)
- 解秀涛;谢晋水;冯振鲁;刘国庆;: "北京地铁10号线海淀黄庄站风道大断面开挖及转入车站主体暗挖进洞施工技术"
- 解秀涛;谢晋水;冯振鲁;刘国庆;: "北京地铁10号线海淀黄庄站风道大断面开挖及转入车站主体暗挖进洞施工技术", 铁道标准设计, no. 12, pages 112 - 116