Train coupling failed train rescue method and system
Abstract
The invention provides a train coupling failed train rescue method and system. The method comprises the steps that when a dispatch center confirms that a failed train cannot move, a coupling order and a continuous operation order are sent to a rescue train through an integrated monitoring system so as to enable the rescue train to travel towards, approach and couple the failed train, and after coupling succeeds, the integrated monitoring system sends a coupling operation order to the rescue train; the rescue train sends a brake relieving order to the failed train so as to enable the failed train to relive emergency brake and parking brake; and the rescue train travels towards a destination and is braked after reaching the destination. According to the train coupling failed train rescue method and system, under the condition that the rescue train is unpiloted, the rescue train can rapidly couples the failed train to achieve rescue under control of the integrated monitoring system, the rescue efficiency is improved, the labor cost is reduced, and the equipment modification cost is low.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 35.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 35 total)
References Cited — Backward Prior Art (4)
Non-Patent Literature (1)
- 毛楚楚: "城轨列车运行延迟调整的若干问题研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》