Scheduling failover for lighting controls
Abstract
A lighting control system of networks and devices designed to allow scheduled events to continue to operate in the case of partial or full network operation and failure. The lighting control system can rely on any network controller to act as a schedule master that evaluates a schedule of time-based lighting control events. When failure of the acting schedule master occurs or network communication therewith, the lighting control system changes the scheduling master to a different network controller based on a failover protocol. The failover protocol includes detecting when an acting schedule master controller stops working by, for example, failing to receive a keep-alive message at a different network controller within a predetermined amount of time. Upon detecting failure of the schedule master controller, a network controller with a different controller identifier takes over as the schedule master in accordance with a controller identifier evaluation or protocol.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 0.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (0)
No backward patent references recorded.