Method and apparatus for establishing fluid communication between horizontal wells
Abstract
A method of starting up a well pair for EOR by establishing fluid communication between the wells is disclosed. The method includes the steps of providing a fluid based heat delivery system in each well of said well pair, and circulating a heated non-deasphalting start-up fluid in each well at a first temperature. Then, applying a pressure differential between the wells to encourage start-up fluid displacement across an inter well bore region, and controlling a viscosity of the start- up fluid through one or both of temperature and concentration control, to encourage hydraulically sweeping the inter well bore region, and transitioning from displacing the start-up fluid to a working fluid extraction process.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 0.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (0)
No backward patent references recorded.