Fast assembly method for large steam generators
Abstract
Abstract For the rational erection of large steam generators (1), a boiler structural steelwork (2) is first erected with an outer roof section (7), which includes a plurality of main beams (7a to 7c). At least one, e.g. main beam (7b), bridges the gas pass to be erected. When the main beams (7a to 7c) have been assembled, the erection of the upper boiler wall commences, whereby the corresponding parts are lifted between the main beams (7a to 7c) from above into the boiler structural steelwork and positioned. The erection of the inner boiler structural steelwork roof (8), in one piece or divided into roof modules (8a, 8b), suspended beneath its subsequent installation point inside the space bounded by the boiler columns (3), begins immediately. Internal components are fixed to the roof modules (8a, 8b). The construction unit thus erected is raised upwards all in one piece or roof module by roof module and assembled between the main beams (7a, 7b, 7c) or beneath the same. The production method proposed in this regard permits a further shortening of the construction times of steam generators, in particular when their gas pass has a large cross-section which exceeds the dimensions 15
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 1 · Forward citations: 1.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 9,696,029 B2 | Method for erecting a boiler, module and boiler comprising the module | 2017 | 4 |
References Cited — Backward Prior Art (1)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2001023665 A1 | Steam generator and process for assembling it | — | 14 |