Method and installation for dry cooling of metallurgical slag with heat recovery - with use of trough belt conveyor for slow solidification of slag into a crystalline structure
Abstract
Slag is cast in a controlled manner into non insulated troughs of a trough belt conveyor (3) for slow cooling and solidification into a crystalline structure. Heat is recovered by means of radiation panels and air flow channels located respectively above and within the conveyor structure. The claimed installation includes an intermediate slag container (1) with a sedimentation sump and a measuring probe (10), a distributer channel (2) with a burner (12), a trough belt conveyor (3), radiation panels (14), air flow channels (15/1, 15/2, 15/3), a cooling shaft (5) or a vibratory conveyor, and waste heat boilers (7, 8).
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 3.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (4)
Non-Patent Literature (1)
- PATENT ABSTRACTS OF JAPAN, UNEXAMINED APPLICATIONS, SEKTION C, BAND 3, NR. 27, 7. MÄRZ 1979 (07.03.79) THE PATENT OFFICE JAPANESE GOVERNMENT, SEITE 96 C 39 & JP 54-002295 A (MITSUI ZOSEN K K)