Verfahren und anlage zum herstellen von bewehrungsgittermatten
Abstract
PCT No. PCT/AT93/00013 Sec. 371 Date Oct. 6, 1993 Sec. 102(e) Date Oct. 6, 1993 PCT Filed Feb. 3, 1993 PCT Pub. No. WO93/16825 PCT Pub. Date Sep. 2, 1993.A process and installation for producing reinforcement wire meshes by welding longitudinal and transverse wires (L, Q) together at their crossing points, leaving ends (E) or the transverse wires projecting beyond the longitudinal edge wires using a continuous wire meshes welding machine, in which, in order to produce reinforcement wire meshes where at least one of the projecting ends or the transverse rods is bent back towards the longitudinal edge wire in the form or a loop and welded thereto, straight transverse wires are supplied, at least one of the ends in front of the weld line of the wire meshes welding machine is bent back in the form of a loop towards the longitudinal edge wire (L') and the loop end (S) is welded to the longitudinal edge wire in the weld line (C) at the same time as the longitudinal and transverse wires are welded together.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 1.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗