Method of producing a tubular foundation in the ground
Abstract
A method of producing a tubular foundation in the ground. In a first operation, a ramming peg 1 is used to ram into the ground 3 a hole 2 of a depth which is less than the length or depth t of the tubular foundation 5 to be produced. In a second operation, castable concrete 4 is poured into the hole 2 and the hole 2 is partially filled with the concrete 4. Subsequently, in a third operation, the ramming peg 1 is driven once again into the hole 2, to be precise in such a way that the hole 2 and the concrete 4 in it go down to the final depth t of the foundation 5 and the concrete 4 in the hole is formed laterally around the ramming peg 1 in a tubular form and is compacted. Subsequently, the ramming peg 1 is drawn out of the tubular foundation 5. <IMAGE>
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 3.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| DE 202012013459 U1 | Stahlbeton-Rammpfahlfundament | — | 0 |
| EP 1,731,679 A1 | Ram tip | — | 0 |
| EP 1,158,104 A1 | Pile formation | — | 3 |
References Cited — Backward Prior Art (0)
No backward patent references recorded.