Verfahren zur errichtung von schotterlosem oberbau sowie ein nach diesem verfahren hergestellter oberbau
Abstract
A permanent way without ballast and a process for producing the same for the rails of tracks, in which process a base surface is levelled and, if appropriate, is provided with a levelling layer of concrete, and prefabricated supporting plates are arranged with concrete, in each case for at least two rails, on the consolidated base surface and at a distance from the latter, the supporting plates having a greater extent than is normally the case in the longitudinal direction of the rails, and the intermediate space formed is filled with a mixture, the supporting plate being set in its final position parallel to the base surface by means of supports which are supported on the base surface, are releaseably connected to the supporting plate and the effective length of which is changed, whereupon a hardening flowable mixture is introduced between the supporting plate and the base surface and this mixture is allowed to harden at least partially, whereupon the supports are removed and, if appropriate, the remaining openings for the supports are sealed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 12.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗