The invention provides a double-layer decompression waterproof and drainage system for a karst water-rich tunnel and a construction method thereof. The outer side drainage layer comprises an outer side longitudinal drainage blind pipe, an outer side circumferential drainage…
Inventor / Author Profile
Li Tangjun
0Total Forward Citations
2Indexed Patents
0Patent H-Index
Frequent Co-Inventors: Hu Bo Huang Zhejun Li Panpan Liao Yipeng Shan Xiaoqing Tan Qiang Tian Shikuan Wan Fei Wang Hualao Wang Zhanqiang Xie Zhaojun Zhang Peng
The invention provides a method for preventing and controlling a layered slope blasting flyrock and a vibration secondary disaster, which belongs to the technical field of slope blasting, and comprises the following steps: the method comprises the steps of analyzing the…