A method and apparatus for installing a pile or load-bearing element into soft ground, wherein a non-percussive force, rather than a percussive force such as that applied by a hammer or a jack, is applied to the top of a hole-forming tool or pile ( 1 ) so as to push the…
fleming-wilfred
Apparatus for forming a stone column in the ground is disclosed. The apparatus comprises a pair of concentric tubes (2,3) the inner one (2) of which is open at both ends, and at or near its lower end may be connected to the outer tube (3) by an outwardly extending wall portion…
@ Apparatus for forming a stone column in the ground is disclosed. The apparatus comprises a pair of concentric tubes (2, 3) the inner one (2) of which is open at both ends, and at or near its lower end is connected to the outer tube (3) by an outwardly extending wall portion…
A tool for enlarging a portion of an underground shaft is disclosed. The tool comprises a generally cylindrical body portion 32 the axis of which defines an axis of rotation and which has at least one slot 23, 24 or opening in its side. At least one cutting member 25, 26 is…
A method of forming a cast-in-situ pile using a hollow pile-forming tool 21 with blades 22 attached to a lower end and apertures 24. The tool is pushed into the ground in non-percussive manner to a first depth and then rotated about its longitudinal axis so that the blades…
A method and apparatus for installing a pile or load-bearing element into soft ground, wherein a non-percussive force, rather than a percussive force such as that applied by a hammer or a jack, is applied to the top of a hole-forming tool or pile (1) so as to push the…
The method involves driving into the ground a mandrel (1) carrying a pile shoe (2) and pumping a cementitious mixture (4) into the hole through the interior of the mandrel (1) as it is being driven into the ground. The cementitious mixture (4) leaves the interior of the mandrel…
A method of protecting and/or stabilising a cementitious structure from adverse effects due to ground heave and/or thermal shrinkage is disclosed. The method comprises embedding into the cementitious structure during its construction and before the cementitious material has…
A method and apparatus for installing a load bearing pile or column in the ground wherein a non-percussive force is applied to the top of a hole-forming tool 8 or pile so as to push the tool or pile in a substantially continuous motion to a first depth. The tool or pile is then…
A hole forming tool comprises a cylindrical body 2, a blade 3 that extends from the base of the body in a longitudinal direction, and an aperture in the base of the body for the pumping in of concrete or grout when the tool is removed. The blade may be laminar, trapezoidal,…
The method involves driving into the ground a mandrel (1) carrying a pile shoe (2) and pumping a cementitious mixture (4) into the hole through the interior of the mandrel (1) as it is being driven into the ground. The cementitious mixture (4) leaves the interior of the mandrel…
A hole forming tool comprises a cylindrically shaped body (2) having a longitudinal axis and at least one aperture at the base thereof, and at least one blade (3) extending from the base of said cylindrically shaped body, this blade or blades being arranged such that, in use, it…
@ Apparatus for forming a stone column in the ground is disclosed. The apparatus comprises a pair of concentric tubes (2, 3) the inner one (2) of which is open at both ends, and at or near its lower end is connected to the outer tube (3) by an outwardly extending wall portion…
A method of forming a cast-in-situ pile having a shaft and a base of greater cross sectional area than the shaft by using an auger is disclosed. The auger is first bored into the ground until its tip reaches a given depth. The auger is then lifted by a predetermined distance…
There is disclosed a method of forming a cast-in-situ pile having a shaft and a base of greater cross-sectional area than the shaft by using an auger (1). The auger is first bored into the ground until its tip reaches a given depth. The auger is then lifted by a predetermined…
A method and apparatus for installing a pile or load-bearing element into soft ground, wherein a non-percussive force, rather than a percussive force such as that applied by a hammer or a jack, is applied to the top of a hole-forming tool or pile (1) so as to push the…