This invention relates to a method of terminating the undesirable flow of fluid through a gravel pack in a wellbore, or from a highly permeable portion of or fracture in a subterranean formation into a wellbore, which method involves the use of a hydraulic cement consisting of…
Ewert David
This invention relates to a method of repairing holes, channels, voids and microannuli in a cement sheath situated in the annular space between a casing and the wall of a wellbore penetrating a subterranean earth formation, which method involves the use of a hydraulic cement…
This invention relates to a method of repairing a hole in and thereby terminating the undesirable flow of fluid through a hole in a casing disposed in a wellbore penetrating a subterranean earth formation which method involves the same use of a hydraulic cement consisting of…
Tracking fluid displacement along a wellbore using real time temperature measurements. A method of tracking fluid displacement along a wellbore includes the steps of: monitoring temperature in real time in the wellbore; and observing in real time a variation in temperature…
Tracking fluid displacement along a wellbore using real time temperature measurements. A method of tracking fluid displacement along a wellbore includes the steps of: monitoring temperature in real time in the wellbore; and observing in real time a variation in temperature…
Methods of forming one or more plugs in a well bore are provided. The methods basically comprise the steps of dropping into the well bore a cementitious material which will delayedly react with water therein to form an impermeable solid and which has been formed into…
A system and method for monitoring a property and controlling electrical devices located at the property via a network is disclosed. The system may include a controller, a monitoring device and a device having a first state and a second state. The controller receives an image…
Tracking fluid displacement along a wellbore using real time temperature measurements. A method of tracking fluid displacement along a wellbore includes the steps of: monitoring temperature in real time in the wellbore; and observing in real time a variation in temperature…
Tracking fluid displacement along a wellbore using real time temperature measurements. A method of tracking fluid displacement along a wellbore includes the steps of: monitoring temperature in real time in the wellbore; and observing in real time a variation in temperature…
Tracking fluid displacement along a wellbore using real time temperature measurements. A method of tracking fluid displacement along a wellbore includes the steps of: monitoring temperature in real time in the wellbore; and observing in real time a variation in temperature…
Tracking fluid displacement along a wellbore using real time temperature measurements. A method of tracking fluid displacement along a wellbore includes the steps of: monitoring temperature in real time in the wellbore; and observing in real time a variation in temperature…
The present application relates to a multilayer cation exchange chlor-alkali membrane. The present application provides a multi-layered cation exchange membrane for use in a chloralkali process, the multi-layered cation exchange membrane comprising a carboxylate layer comprising…
The application relates to a switching regulator, a method for sensing a ready state of a driver of a switching regulator, a multiphase switching regulator. The switching regulator includes a driver having a driver wake-up circuit configured to report a ready state of the driver…