A method includes determining an operational parameter of a first vehicle traveling with a plurality of vehicles in a transportation network and/or a route in the transportation network, identifying a failure condition of the first vehicle and/or the route based on the…
Julich Paul
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global…
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global…
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global…
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global…
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global…
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into a plurality of planning areas with a boundary element of common track between adjacent planning areas, using a local coordinating agent for controlling…
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into at least one control area with a dispatcher assigned to manage the movement of trains in a control area by predicting the occurrence of events along the…
A method includes determining an operational parameter of a first vehicle traveling with a plurality of vehicles in a transportation network and/or a route in the transportation network, identifying a failure condition of the first vehicle and/or the route based on the…
A multi-level system for management of a railway system and its operational components in which the railway system has a first level configured to optimize an operation within the first level that includes first level operational parameters which define operational…
A system and method of scheduling the movement of trains as a function of the predicted crew behavior and predicted rail conditions based on the historical behavior of the crew for specific rail conditions.
A method of scheduling the movement of trains as a function of the predicted crew behavior and predicted rail conditions.
A multi-level system for management of a railway system (50) and its operational components in which the railway system (50) has a first level configured to optimize an operation within the first level that includes first level operational parameters which define operational…
A method of scheduling network resources in a first domain by transforming the problem to a second domain, solving the problem and transforming back to the first domain.
A method of optimizing the movement of plural trains using a front end cost function that evaluates the costs of each railcar in the consist of a train.
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into at least one control area with a dispatcher assigned to manage the movement of trains in a control area by predicting the occurrence of events along the…