CN 108,133,111 A#1091764 Most Cited · 46 citations5.8/yr · PR 6.24ActiveCN · Utility
A kind of Study on Temperature Field method and temprature control method based on mass concrete

The invention discloses a kind of Study on Temperature Field methods and temprature control method based on mass concrete, the research method of the present invention is by establishing mass concrete solid research object, survey temperature of the multiple measuring points of…

CN 112,412,475 A#3233968 Most Cited · 24 citations4.8/yr · PR 3.71ActiveCN · Utility
Method for reinforcing and excavating surrounding rock of ice water accumulation body tunnel under influence of seasonal rainfall and surrounding rock support

The invention relates to a method for reinforcing and excavating surrounding rocks of a tunnel with ice water accumulation under the influence of seasonal rainfall and a surrounding rock support, aiming at the reinforcing method, the method comprises the following steps: s1:…

CN 113,586,069 A#3226978 Most Cited · 24 citations4.8/yr · PR 3.83ActiveCN · Utility
Indoor test device for simulating shield water-rich stratum synchronous grouting construction technology and using method thereof

The invention discloses an indoor test device for simulating a shield water-rich stratum synchronous grouting construction technology and a using method thereof. The simulated shield shell is pulled out through a power system shrinkage jack, the segment lining of the simulated…

DE 202021103010 U1#3749695 Most Cited · 22 citations4.4/yr · PR 2.62ActiveDE · Utility
Stützstruktur für Installation von zusammenfügbaren Abdeckbalken einer vorgefertigten Brücke

Stützstruktur für Installation von zusammenfügbaren Abdeckbalken einer vorgefertigten Brücke, umfassend einen fest mit einer Lagerplattform (2) verbundenen Verbindungssitz, dessen obere Ende fest mit Stützstangen verbunden ist, wobei ein Rückwirkungskraftrahmen (8) fest mit den…

CN 102,587,295 A#4234094 Most Cited · 20 citations1.4/yr · PR 3.31ActiveCN · Utility
Under-supported basket form fine-adjustment system and under-supported basket form adjustment method

The invention discloses an under-supported basket form fine-adjustment system and an under-supported basket form adjustment method, which are characterized in that side-from lateral movement devices, diagonal screws, horizontal screws, side-form longitudinal beams, a telescopic…

CN 202,116,952 U#4208821 Most Cited · 20 citations1.4/yr · PR 3.57ActiveCN · Utility
Rail steering gear
Inventors: Chao Liang, Zhen Yang, Bo Li, Bin LiAssignee: First Eng Co Ltd Ctec GroupFiled 2011-05-31 · Granted 2012-01-18

The utility model provides a rail steering gear, which comprises a turn plate. The turn plate is mounted on a rail base rotationally and is provided with a fixed guide rail and limit holes, the rail base is provided with limit slots corresponding to the limit holes on the turn…

CN 102,322,851 A#4410681 Most Cited · 19 citations1.4/yr · PR 5.59ActiveCN · Utility
Method for measuring second-grade river-crossing leveling height difference by using intelligent total station

The present invention discloses a method for measuring second-grade river-crossing leveling height difference by using an intelligent total station. The method is characterized in that, various river-crossing leveling points are firstly arranged; the height difference among the…

CN 102,433,827 A#4501579 Most Cited · 19 citations1.4/yr · PR 3.72ActiveCN · Utility
Construction lofting method for high-speed loop road surface of test yard

The invention discloses a construction lofting method for a high-speed loop road surface of a test yard, which is characterized in that basic control network points are arranged on the inner side of a roadbed at a curve section of a loop, and a basic control network is…

CN 102,943,466 A#4447750 Most Cited · 19 citations1.5/yr · PR 4.50ActiveCN · Utility
Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction

The invention discloses a construction method for a miniature steel pipe concrete pile to penetrate through a roadbed layer for reinforcing the soft foundation construction and belongs to the technical field of engineering construction. The construction method solves the…

CN 106,997,048 A#4503373 Most Cited · 19 citations2.1/yr · PR 3.70ActiveCN · Utility
A kind of laser radar contact network construction sync detection device and method

A kind of laser radar contact network construction sync detection device and method.In contact net system, generally current carrying quality of the contact suspension in electric railway is assessed using the geometric parameter and the class parameter of kinetic parameter two…

CN 109,318,354 A#4514336 Most Cited · 19 citations2.7/yr · PR 3.59ActiveCN · Utility
A kind of integrated device for the dedusting of box girder formwork automatically grinding and spraying

The invention belongs to high-speed rail Construction of Precast Box Beam technical fields, more particularly to a kind of integrated device for the dedusting of box girder formwork automatically grinding and spraying, solve the problems, such as that the large scale…

WO 2022/111518 A1#4575098 Most Cited · 19 citations4.8/yr · PR 3.05PendingWO · Application
Visual surrounding underground water level monitoring and early-warning threshold design method for a deep foundation pit

A visual surrounding underground water level monitoring and early-warning threshold design method for a deep foundation pit. An optimized arrangement mode for monitoring wells outside a pit of a monitoring section is provided, such that the variation in the water level outside…

CN 112,627,860 A#4934622 Most Cited · 18 citations3.6/yr · PR 2.97ActiveCN · Utility
Advanced grouting method for tunnel face of cement-rich rock stratum

A method for advance grouting of a tunnel face of a cement-rich rock stratum tunnel comprises the following steps: (1) performing advanced geological forecast; (2) grouting the tunnel face of the cement-rich rock stratum, and determining a target grouting reinforcement area; (3)…

CN 102,635,369 A#5166839 Most Cited · 17 citations1.2/yr · PR 4.42ActiveCN · Utility
Construction method for integrally pouring inverted arch concrete by matching trestle with top formwork

The invention discloses a construction method for integrally pouring inverted arch concrete by matching a trestle with a top formwork, which belongs to the construction method for pouring inverted arches concrete of tunnels and relates to the manufacture and utilization of top…

CN 106,746,834 A#5306267 Most Cited · 17 citations1.9/yr · PR 3.07ActiveCN · Utility
A kind of graphene-based nanocrystal class early strength agent and preparation method thereof

The invention belongs to technical field of concrete additives, there is many drawbacks to solve existing early strength agent, often cause workability of concrete and durability, or even impervious and corrosion resistance is the problems such as reduce, there is provided a…

CN 202,000,264 U#5123982 Most Cited · 17 citations1.1/yr · PR 5.64ActiveCN · Utility
Bridge body full framing construction preloading system
Inventors: Chao Liang, Hongbin Zhang, Bin Li, Bo Li, Zhen YangAssignee: First Eng Co Ltd Ctec GroupFiled 2011-03-03 · Granted 2011-10-05

The utility model discloses a bridge body full framing construction preloading system, which is characterized in that anchors are disposed right below a full framing for cast-in-situ bridge body construction, and a preloading unit consisting of a hydraulic jack and vertical tie…

CN 107,478,725 A#5683024 Most Cited · 16 citations1.8/yr · PR 3.41ActiveCN · Utility
Rock partition wall method for estimating stability is pressed from both sides in a kind of vcehicular tunnel

The present invention relates to rock partition wall method for estimating stability is pressed from both sides in a kind of vcehicular tunnel, its sensor that rock partition wall both sides are pressed from both sides in tunnel using being distributed in matrix form carries out…

CN 207,260,137 U#5808091 Most Cited · 16 citations2.0/yr · PR 2.73ActiveCN · Utility
Large Bored Piles pile foundation steel bar cage mounting and positioning device

The utility model is a kind of Large Bored Piles pile foundation steel bar cage mounting and positioning device, solves major diameter, big depth steel reinforcement cage is connecing cage, there are larger difficulty in position fixing process, the problem of so as to seriously…

CN 102,116,003 A#6104625 Most Cited · 15 citations1.0/yr · PR 3.94ActiveCN · Utility
Fine-tuning construction method for CRTS I (China railway track system) type slab ballastless track

The invention discloses a fine-tuning construction method for a CRTS I (China railway track system) type slab ballastless track, comprising the following construction steps: (1) establishment and measurement of a GRP (government railway policy); (2) fine tuning of track slabs;…

CN 102,174,894 A#6160130 Most Cited · 15 citations1.0/yr · PR 3.44ActiveCN · Utility
Follow-up pipe shed construction method

The invention discloses a follow-up pipe shed construction method, which relates to the technical field of tunnel construction, in particular to a follow-up pipe shed construction method in tunnel pre-support. The invention solves the problem of severe hole collapse existing in…

CN 102,900,021 A#6119118 Most Cited · 15 citations1.1/yr · PR 3.78ActiveCN · Utility
Split mounting type bridge wet joint construction method

The invention discloses a split mounting type bridge wet joint construction method comprising the following steps: a. fixing a template with a pull rod, lifting the template through a miniature hoisting machine, reserving template mounting and hanging down holes, successfully…

CN 103,726,425 A#6054185 Most Cited · 15 citations1.2/yr · PR 4.80ActiveCN · Utility
Foamed light soil construction method

The invention discloses a foamed light soil construction method. After the construction of a reinforced concrete protection wall and a soil subgrade is completed, foamed light soil is poured on the soil subgrade, and a galvanized wire mesh, a cushion layer and a reinforced…

CN 106,882,697 A#6321347 Most Cited · 15 citations1.7/yr · PR 2.67ActiveCN · Utility
A kind of large scale structure reinforcing bar is without deformation suspender and hanging method

A kind of large scale structure reinforcing bar that the present invention is provided includes at least two parallel relative girders and a plurality of auxiliary girder being vertically fixed on girder without deformation suspender and hanging method, the girder is…

CN 203,624,403 U#6402478 Most Cited · 15 citations1.2/yr · PR 2.36ActiveCN · Utility
Rail guided trolley for conveying materials for high-slope pitching

The utility model belongs to the technical field of tools for conveying materials for high-slope pitching and provides a rail guided trolley for conveying the materials for high-slope pitching. The problems that manual conveying is used for conveying materials for pitching on a…

CN 102,691,244 A#6608095 Most Cited · 14 citations1.0/yr · PR 4.66ActiveCN · Utility
Construction method of asphalt noise pavement

The invention discloses a construction method of an asphalt noise road surface, which is characterized in that after the construction of a roadbed and a base layer on the roadbed is completed, an asphalt lower surface layer is paved on the base layer, an asphalt upper surface…