A rental control system for controlling the rent and return of cassettes is disclosed. Each cassette internally contains an article such as a recorded information medium, with an IC circuit for storing commodity information concerning the article, and a signal output unit for…
dan-co
PROBLEM TO BE SOLVED: To provide an economical soil heat utilization system that prevents a heating medium from leaking without having to construct a characteristic heat-conducting pipe for utilizing soil heat by utilizing a foundation pillar which is buried in the earth as the…
PROBLEM TO BE SOLVED: To determine optimal operating number of heat sources depending on the variation of load conditions of an air conditioning heat source unit and to realize control of the operating number of heat sources for achieving further energy saving operation, and…
PROBLEM TO BE SOLVED: To provide a primary pump type heat source flow variable system which performs economical and high energy saving effect of heat source control by controlling the flow rate of a heat medium variably, according to the fluctuation of the air conditioning load…
PROBLEM TO BE SOLVED: To provide a plumbing system which can draw up an suitable plumbing routing interactively and at a short time reflecting restriction conditions of logical connection of an apparatus group. SOLUTION: The system of this invention is characterized in that it…
PROBLEM TO BE SOLVED: To provide a dehumidification system which reuses exchange heat contained in heated air for regenerating a dehumidification function of a desiccant rotor, and can utilize the exchange heat in a circuit of a heat pump.SOLUTION: A dehumidification system 10A…
PROBLEM TO BE SOLVED: To provide an operation evaluation system of an energy plant that can realizes highly precise and highly reliable plant operation evaluation and can compare and verify economic efficiency and energy saving to operate the plant. SOLUTION: The operation…
PROBLEM TO BE SOLVED: To provide an equipment cooling system capable of preventing contamination of equipment caused by penetration of outside air, not requiring installation of a dehumidifying means for removing humidity contained in the outside air, and allowing the equipment…
PROBLEM TO BE SOLVED: To provide a building management system capable of executing the operation control of equipment such as air conditioners and illuminations and processing request for check or the like of information such as set value and temperatures through electronic…
PROBLEM TO BE SOLVED: To provide an economical variable flow control system for an exhaust heat recovery and heat source high in its energy saving effect and excellent in its environmental protection by effectively using heat exhausted from a cogeneration plant or the like.…
<P>PROBLEM TO BE SOLVED: To provide a cleaning system of an air conditioner of high cleaning efficiency, capable of automatically and effectively cleaning the powdered matter attached to a casing inner face and a heat exchanger of the air conditioner. <P>SOLUTION:…
<P>PROBLEM TO BE SOLVED: To provide a washing apparatus for an adsorption filter which permits man-power saving from the aspect of energy cost and makes it possible to save a useless washing time by performing washing while selecting the density of supercritical or…
PROBLEM TO BE SOLVED: To separate gas molecule components contained in air current, take out purified air and separated gases and improve an effect of saving energy by ionizing the air current, applying an electric field to the ionized gases by electrodes, and separating cations…
PROBLEM TO BE SOLVED: To provide a primary/secondary pump type heat source variable flow rate system for performing economic and energy saving heat source control with excellent responsiveness to the disturbance of heat medium temperature conditions. SOLUTION: The system…
To improve convenience for construction management.SOLUTION: There is provided a construction support device 3 for supporting construction for fitting a member B forming a building facility K to an architectural structure, comprising: a construction plan information storage part…
PROBLEM TO BE SOLVED: To provide an operation estimation device for a variable control system wherein cost saving effect and energy saving effect after introduction of the variable control system can be estimated quantitatively and in real time while comparing it with a prior…
<P>PROBLEM TO BE SOLVED: To provide a remotely managing system of building which can manage an operation of a facility apparatus installed in a plurality of the buildings at a remote position at a low communication cost. <P>SOLUTION: The building remotely managing…
<P>PROBLEM TO BE SOLVED: To provide a ventilation device capable of safely and securely replacing a relatively large and heavy filter. <P>SOLUTION: The ventilation device includes a pressure fan unit 14 mounted to an opening 11 of a wall W for separating inside and…
PROBLEM TO BE SOLVED: To provide an air conditioning system that humidifies conditioned air during air conditioning operation, and achieves sterilization operation using functional water when there is a need to sterilize a humidifying element in an air conditioner.SOLUTION: An…
PROBLEM TO BE SOLVED: To provide a room pressure control method at the start of air-conditioning operation where a clean room is protected against pollution by preventing the in-room air pressure of the clean room from becoming negative at the start of air-conditioning operation…
<P>PROBLEM TO BE SOLVED: To provide an automatic interior cleaning air conditioner which automatically cleans out powder adhering to inner part of a casing or a heat exchanger, while being installed regardless of a floor type or a ceiling type. <P>SOLUTION: In this…
<P>PROBLEM TO BE SOLVED: To provide a filter device installed in a ventilation duct capable of cleaning a filter main body for removing dust mounted in a ventilation duct such as an outside air introduction duct, without taking out the same from the inside of the duct.…
PROBLEM TO BE SOLVED: To provide a humidifying device to be decreased in a cost and excellent in controllability and rapidly cope with the sudden fluctuation of a humidifying load when regulated humidity air is fed to a cultivation room to demand maintenance of high humidity.…
PROBLEM TO BE SOLVED: To provide a heating/cooling system having excellent economy and energy saving performance by supplying heating medium for optimal heating/ cooling depending on the variation of load conditions of a building. SOLUTION: The heating/cooling system comprises a…
PROBLEM TO BE SOLVED: To provide an optimum operation control system controlling a plant operation according to a high precise operation plan and outputting a high reliable operation plan. SOLUTION: This system suppresses redundant steam of a plant and controls the inflow and…