{"pub_number":"US12372683B2","doc_number":"12372683","country":"US","kind_code":"B2","patent_type":"utility","status":"active","title":"Autonomous operations in oil and gas fields","abstract_text":"The present disclosure relates to a system that is operable to receive an execution plan and execute a control operation on one or more equipment based operations within the execution plan. The one or more operations may include a data capturing operation associated with a resource site. In one embodiment, the system may be operable to execute at least a first operation in response to a success variable of the data capturing operation indicating a successful execution of the data capturing operation. The first operation may include a quality control operation that is executed by comparing at least one characteristic of the captured data to an expected characteristic to generate quality state data. The quality state data may have one of an acceptable status and an undesirable status. In response to the quality state data indicating an acceptable status for the quality control operation, executing at least a second operation.","claims":[{"number":1,"text":"A method for performing a service at a resource site, wherein the service includes capturing sensor data at the resource site using at least one sensor, the method comprising: receiving an execution plan at the resource site, the execution plan including one or more operations associated with executing the service, each operation comprised in the one or more operations being associated with at least one of a failure variable or a success variable; executing the execution plan, at least in part, at the resource site, wherein executing the execution plan comprises: executing a lowering operation to lower a downhole tool comprising the at least one sensor to a first location within a wellbore at the resource site; and executing a control operation comprised in the one or more operations on one or more equipment to trigger an action by the one or more equipment, the control operation including a data capturing operation of data associated with the resource site, the captured data including","independent":true},{"number":2,"text":"The method of claim 1, wherein the execution plan includes at least one of: a resource model representative of the resource site including at least one of a parameter value or an uncertainty value of one or more parameters of the resource model; or an equipment model, including at least a parameterization of the one or more equipment.","independent":false,"depends_on":[1]},{"number":3,"text":"The method of claim 2, wherein the equipment model includes a parameterization of the at least one sensor, wherein the one or more operations includes parameterizing the at least one sensor based on the equipment model to capture data associated with the resource site.","independent":false,"depends_on":[2]},{"number":4,"text":"The method of claim 2, wherein the one or more operations include updating at least one of the resource model or the equipment model in response to the quality state data indicating an undesirable status for the quality control operation.","independent":false,"depends_on":[2]},{"number":5,"text":"The method of claim 1, wherein the data capturing operation includes acquiring sensor data from at least a first target location of the resource site, wherein executing the execution plan further comprises executing an operation that acquires sensor data from at least a second target location in response to the quality state data indicating an undesirable status, wherein the second target location is different from the first target location.","independent":false,"depends_on":[1]},{"number":6,"text":"The method of claim 1, wherein the quality control operation includes evaluating an accuracy of the captured data using one of a machine learning system or an artificial intelligence system to confirm the accuracy of the captured data based on historical data associated with the resource site.","independent":false,"depends_on":[1]},{"number":7,"text":"The method of claim 1, wherein the quality control operation is executed based on a quality control (QC) model of the execution plan including at least the expected characteristic.","independent":false,"depends_on":[1]},{"number":8,"text":"The method of claim 1, wherein: the data capturing operation includes acquiring the sensor data using the at least one sensor at least at a first target location of the resource site; and the quality control operation including evaluating an accuracy of one or more acquisition parameters used during the data capturing operation, wherein the acquisition parameters include one or more sensor parameters.","independent":false,"depends_on":[1]}],"description":"CROSS-REFERENCES TO RELATED APPLICATIONS\nThis application is a 371 application from PCT Application No. PCT/US2020/049428 filed on Sep. 4, 2020, which claims priority to and the benefit of U.S. Provisional Patent Application Ser. No. 62/895,755 filed on Sep. 4, 2019, U.S. Provisional Patent Application Ser. No. 62/925,980 filed on Oct. 25, 2019, and U.S. Provisional Patent Application Ser. No. 62/939,047 filed on Nov. 22, 2019, all of which are hereby incorporated by reference in their entireties for all purposes.\nBACKGROUND\nDuring resource explorations and exploitations such as oil or gas explorations and exploitations, significant planning is conducted to assess different considerations related to the explorations and exploitations operations, such as well integrity or considerations that affect production at the resource site. These considerations may include estimates of how much resource is available to begin with, types of equipment and systems needed for site planning, specific equipment configuration parameters that enhance optimal resource extraction, feasibility of extracting the resource given geological data of the resource site, regulatory requirements for safely exploiting the resource, etc. Data associated with the resource or installation can provide experts with information regarding some of the aforementioned considerations.\nWhile capturing data at the resource site with sensors has its own challenges, a major problem faced during oil or gas explorations, for example, is leveraging a plurality of data points from resource site data to more accurately characterize parameters of interest associated with, for instance, a given resource (e.g., hydrocarbon in place associated with an oil or natural gas reservoir). For example, when the operations at stake include production, a difficulty faced during such exploratory planning phases is accurately scaling production operations based on resource models derived from test process executions and test sensor ","inventors":[{"name":"Morten Kristensen","slug":"morten-kristensen","city":"Lysaker","country":"NO"},{"name":"Marie LeFranc","slug":"marie-lefranc","city":"Lysaker","country":"NO"},{"name":"Bertrand Theuveny","slug":"bertrand-theuveny","city":"Paris","country":"FR"},{"name":"Hadrien Dumont","slug":"hadrien-dumont","city":"Paris","country":"FR"},{"name":"Nikita Chugunov","slug":"nikita-chugunov","city":"Arlington","country":"US"},{"name":"Sebastien Roche","slug":"sebastien-roche","city":"Paris","country":"FR"},{"name":"Wiwin Yuliana","slug":"wiwin-yuliana","city":"Beijing","country":"CN"},{"name":"Zhenning Bao","slug":"zhenning-bao","city":"Beijing","country":"CN"},{"name":"Erwan Olliero","slug":"erwan-olliero","city":"Houston","country":"US"},{"name":"Ram Sunder Kalyanraman","slug":"ram-sunder-kalyanraman","city":"Houston","country":"US"},{"name":"Thomas Pfeiffer","slug":"thomas-pfeiffer","city":"Sugar Land","country":"US"},{"name":"Claude Signer","slug":"claude-signer","city":"Paris","country":"FR"},{"name":"Simon Edmundson","slug":"simon-edmundson","city":"Houston","country":"US"},{"name":"Hua Yu","slug":"hua-yu","city":"Beijing","country":"CN"},{"name":"Ke Jiang","slug":"ke-jiang","city":"Beijing","country":"CN"},{"name":"Vassilis Varveropoulos","slug":"vassilis-varveropoulos","city":"Sugar Land","country":"US"},{"name":"Henri-Pierre Valero","slug":"henri-pierre-valero","city":"Paris","country":"FR"},{"name":"Eric Jeanson","slug":"eric-jeanson","city":"Houston","country":"US"},{"name":"Guillaume Borrel","slug":"guillaume-borrel","city":"Paris","country":"FR"},{"name":"Pierre Bettinelli","slug":"pierre-bettinelli","city":"Bucharest","country":"RO"},{"name":"Joel Le Calvez","slug":"joel-le-calvez","city":"Houston","country":"US"}],"assignees":[{"name":"Schlumberger Technology Corporation","slug":"schlumberger-technology-corporation","country":"US"}],"examiners":[],"cpc_codes":["E21B 2200/20","E21B 41/00","E21B 47/005","G01V 20/00","G06F 2113/08","G06F 30/28"],"ipc_codes":["E21B 41/00","E21B 47/005","G01V 20/00","G06F 11/30","G06F 113/08","G06F 30/28"],"filing_date":"2020-09-04","pub_date":"2025-07-29","grant_date":"2025-07-29","expiration_date":"2040-09-04","family_members":[],"citations_made":[{"pub_number":"US6012017A","category":"applicant"},{"pub_number":"US6549854B1","category":"applicant"},{"pub_number":"US10119387B2","category":"applicant"},{"pub_number":"US10121261B2","category":"applicant"},{"pub_number":"US10203428B2","category":"applicant"},{"pub_number":"US20090168595A1","category":"applicant"},{"pub_number":"US20090182541A1","category":"applicant"},{"pub_number":"US20090299636A1","category":"examiner"},{"pub_number":"US20140129506A1","category":"examiner"},{"pub_number":"US20160245946A1","category":"applicant"},{"pub_number":"US20160356125A1","category":"applicant"},{"pub_number":"US20170205388A1","category":"applicant"},{"pub_number":"US20170370191A1","category":"applicant"},{"pub_number":"US20180321421A1","category":"examiner"},{"pub_number":"US20190025450A1","category":"applicant"},{"pub_number":"US20190106982A1","category":"applicant"},{"pub_number":"US20190170899A1","category":"applicant"},{"pub_number":"US20200291772A1","category":"applicant"},{"pub_number":"US20200370418A1","category":"applicant"},{"pub_number":"CN110045417A","category":"applicant"},{"pub_number":"WO2016134018A2","category":"applicant"},{"pub_number":"WO2016179766A1","category":"applicant"},{"pub_number":"WO2018236495A1","category":"applicant"},{"pub_number":"WO2019055565A1","category":"applicant"},{"pub_number":"WO2020112974A1","category":"applicant"},{"pub_number":"WO2020185918A1","category":"applicant"},{"pub_number":"WO2021046344A1","category":"applicant"},{"pub_number":"WO2021046356A1","category":"applicant"},{"pub_number":"WO2021046380A1","category":"applicant"},{"pub_number":"WO2021046385A1","category":"applicant"}],"non_patent_literature":["Substantive Exam issued in Saudi Arabia Patent Application No. 522431815 dated Nov. 21, 2023, 12 pages with English translation.","Communication Pursuant to Article 94(3) EPC issued in EP Application 20781136.5 dated Feb. 15, 2023, 5 pages.","Sharma PV, Environmental and Engineering Geophysics 1997, Cambridge University Press, Chapter 2, Gravity Surveying (pp. 11-64).","Sharma PV, Environmental and Engineering Geophysics 1997, Cambridge University Press, Chapter 4, Seismic Surveys (pp. 112-189).","Shaposhnikov, P. et al.,","“","Advanced Techniques in Integrated Cement Evaluation","”",", presented at the SPWLA 54th Annual Logging Symposium, New Orleans, Louisiana, U.S.A. 2013, 15 pages.","Hare, J. L. et al.,"],"drawings_count":0,"source_id":"uspto_patent_grants","upstream_forward_citations":0,"metrics":{"forward_citations":0,"indexed_forward_citations":0,"backward_citations":30,"npl_citations":10,"citations_per_year":0.0,"pagerank":0.0,"citation_rank":3484605,"pagerank_rank":3484605,"velocity_rank":3484605,"family_citations":0}}