{"pub_number":"EP2201218A2","doc_number":"2201218","country":"EP","kind_code":"A2","patent_type":"application","status":"pending","title":"Optimized mine ventilation system","abstract_text":"The optimized mine ventilation system of this invention supplements mine ventilation basic control systems composed of PLCs (Programmable Logic Controllers with human machine interfaces from vendors such as Allen- Bradley™, Modicon™ and others) or DCSs (Distributed Control System from vendors such as ABB™ and others) with supervisory control establishing a dynamic ventilation demand as a function of real-time tracking of machinery and/or personnel location and where this demand is optimally distributed in the work zones via the mine ventilation network and where the energy required to ventilate is minimized while totally satisfying the demand for each work zones. The optimized mine ventilation system operates on the basis of a predictive dynamic simulation model of the mine ventilation network along with emulated control equipment such as fans and air flow regulators. The model always reaches an air mass flow balance where the pressure and density is preferably compensated for depth and accounts for the natural ventilation pressure flows due to temperature differences. Model setpoints are checked for safety bounds and sent to real physical control equipment via the basic control sy","claims":[],"description":"","inventors":[{"name":"MassÉ Michel","slug":"masse-michel","country":"CA"}],"assignees":[{"name":"Simsmart Technologies Inc","slug":"simsmart-technologies-inc","country":"CA"}],"examiners":[],"cpc_codes":["E21F 1/00","E21F 1/003","G05B 15/02","G05B 17/02","G05B 19/042","G05B 2219/2614","Y02P 80/10","Y02P 90/80"],"ipc_codes":["E21F 1/00","G01V 99/00","G05B 13/04"],"filing_date":"2008-09-01","pub_date":"2010-06-30","priority_date":"2007-08-31","application_number":"EP-08806959-A","family_id":"FAM-40385181","family_members":[],"citations_made":[{"pub_number":"US5464369A","category":"TPO"},{"pub_number":"US5803804A","category":"TPO"},{"pub_number":"US6512312B1","category":"TPO"},{"pub_number":"US6645066B2","category":"TPO"},{"pub_number":"US6735556B2","category":"TPO"},{"pub_number":"US6916239B2","category":"TPO"},{"pub_number":"US7123149B2","category":"TPO"},{"pub_number":"WO2007107029A1","category":"TPO"}],"non_patent_literature":["E. WIDZYK-CAPEHART AND C. FAWCETT: \"Life of Mine ventilation requirements for bronzewing mine using ventsim\", pages 815 - 822, XP003026710","GILLIES A.D.S. GILLIES ET AL: \"Development of a real time airflow monitoring and control system\", TENTH US MINE VENTILATION SYMPOSIUM ANCHORAGE, May 2004 (2004-05-01), pages 1 - 10, XP003026713","HARDCASTLE S. ET AL: \"Justifying ventilation-on-demand in a canadian mine and the need for process based simulations\", 11TH U.S./NORTH AMERICAN MINE VENTILATION SYMPOSIUM 2006, 2006, pages 15 - 27, XP003026715","HARDCASTLE S.G. ET AL: \"Ventilation-on-demand-Quantity or quality- A pilot trial at barrick Gold's bousquet mine\", PROCEEDINGS OF THE 8TH US MINE VENTILATION SYMPOSIUM, pages 31 - 38, XP003026714","IAN J, DUCKWORTH ET AL: \"Skyline Mines: Ventilation Planning and Design\", COAL 100 38+ AG '95, pages 1 - 6, XP003026709"],"drawings_count":0,"source_id":"google_patents_public","upstream_forward_citations":0,"metrics":{"forward_citations":0,"indexed_forward_citations":0,"backward_citations":8,"npl_citations":5,"citations_per_year":0.0,"pagerank":0.5550359487533569,"citation_rank":132064228,"pagerank_rank":132064228,"velocity_rank":132064228,"family_citations":0}}